GetACoder.com

 
 

Home | My Account | Post Project | Browse Projects | RSS Feeds New!

 

AZsolt Portfolio

Profile | Portfolio | Contact AZsolt | Post Project to AZsolt
Modeling under Matlab

Modeling under Matlab
sample match: programming, other (programming), testing / quality assurance


ABS reference velocity calculation modeling under MATLAB Simulink, for support the migrating to model based development. Keywords: Executable Specification, white box type testing, functional testing methods.
more infoģ

    

Development cost:

US$ >3000

 
Execution time:
More Than 6 Months
 
Industry:
Automobiles
 

view sample | contact AZsolt | post similar project to AZsolt

C++ development

C++ development
sample match: c++ / c, testing / quality assurance


SIL type simulation environment development. (MS Visual C++, documented by Doxygen). Protocol analyser development. (Borland Turbo C++, documented by Doxygen). Developing an XML-based parameter table loader, ASAP2 loader DLL to improving FAMOS scripting abilities. (Borland C++ Builder 5, open source...
more infoģ

    

Development cost:

US$ 1000-3000

 
Execution time:
Within 3-6 Months
 
Industry:
Automobiles
 

view sample | contact AZsolt | post similar project to AZsolt

ANSI C development

ANSI C development
sample match: c++ / c, testing / quality assurance


My task was to develop an automatic verification program (VERA) for testing Rosetta Lander On-Board Software. To reach this, it was necessary to create a test descriptor script language, which contains the instructions for online automatic evaluation. The base idea was similar to a dialogue, if we...
more infoģ

    

Development cost:

US$ >3000

 
Execution time:
More Than 6 Months
 
Industry:
Transportation, Rail, Road, Air, Marine
 

view sample | contact AZsolt | post similar project to AZsolt

EXCEL - VBA

EXCEL - VBA
sample match: visual basic, testing / quality assurance


- I made a scientific visualisation macro to display and analyse the measurement data on a spatial Excel diagram, to calculate roughness and surface ratio. (MS Office Excel's Visual Basic)
more infoģ

    

Development cost:

US$ 1000-3000

 
Execution time:
Within 3 Months
 
Industry:
Education
 

view sample | contact AZsolt | post similar project to AZsolt

Report Violation    Privacy Policy     Affiliate Program    Terms of Use    Contact Us    Help      GetACoder.com Latest Projects RSS Feed
© 2004-2008 GetACoder. All rights reserved.